Product Description :
long dog leash is a great tool for exercising and training dogs, lightweight but sturdy and durable, it”s easy to coil and carry, this high-visibility rope lead has 4 length for different training purpose, feel soft on your hands, tangle-free to prevent knots that get hung up on the groves, check cord will float if submerged, it has enough length to allow your dog wandering freely and ensure your command to be obeyed, great for teaching your dog recalls and other obedience skills, use it as a backyard dog leash, for off leash dog training, and more! Available Lengths: 9.
5 mm (3/8″) in diameter by 15 ft, 30 ft, 50 ft 100 ft 4 length for different training purpose.
Suitable for small, medium and large dogs.
Details: Padded soft handle+Durable braided rope leash + 360° Rotation clasp to resist twisting + Leather clips Light-weight & tangle-free Durable “ 3/8″ climbers’ rope & nickel-plated iron clip Perfect for off-leash training Floats when submerged for swimming & water play Control from a distance while training Safe, vibrant color high recognizable against any background
Product Details :
Detail | Value |
---|---|
Item Weight | 0.634 ounces |
Item model number | -dl-20211001 |
Date First Available | July 22, 2021 |
Item Package Dimensions L x W x H | 11.69 x 5.75 x 3.23 inches |
Item Dimensions LxWxH | 600 x 0.38 x 0.04 inches |
Target Audience Keyword | dogs |
Color | Orange |
Size | 50 Feet |
Material | Polypropylene, Metal |
Style | snap hook leash |
Breed Recommendation | All Breed Sizes |
Reviews
There are no reviews yet.