Leash Long Lead Obedience Recall Training Agility Puppy Check Cord Lead 15ft 30ft 50ft 100ft Long Leash Great for Training Play Camping Backyard Blue

10.39$

About This Product :

  • LIGHTWEIGHT LONG DOG LEASH FLOATABLE ON THE WATER : soft and lightweight Non-absorbent material won”t get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
  • NO TANGLE CHECK CORD ROPE LEASH: braided climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up.
  • PERFECT TRAINING LEASH FOR DOGS: This training line leash is great for teaching your dog recalls. It has the length needed to allow them to wander and ensure your command to come! is obeyed.
  • SOFT PADDED HANDLE DOG LEAD: Neoprene handle ergonomically designed non-toxic soft padded handle for extra comfort,which provides a firm grip.Enjoy the feeling walks with your dog and protects your hand from rope burn for amazing comfort and control.
  • 15 30 50 100 FOOT LONG LEASH AVAILABLE: dog leash 3/8″ in diam by 15 ft 30 ft 50 ft 100 ft long. Great for hiking, camping, training, hunting, backyard or beach recall training, outdoor playing with tennis balls and swimming!

Details :

  • Size: 30 Feet
  • Color: Blue
  • Material: Polypropylene, Metal
  • Product Dimensions: 180″L x 0.38″W

914 in stock